Blog
Blog If they still do not accept or dispute, we start thinking the surrounding proprietor contests the notification and continue to appoint surveyor on their side. To serve a notice under the Event Wall Act, which concerns structure work with a shared wall, there must be at least a 2-month waiting period prior to the actual structure can begin. The notification should be routed to the proper lawful proprietor and/or tenants of the residential property. Limit